Improving freight flow and predictability on Uganda’s Northern Corridor
Location
Uganda
Topic
Business Regulation and Policy, Transport
Status
Implementation
Year
2026
Context
The Northern Corridor Transit and Transport Coordination Authority (NCTTCA) has a responsibility to coordinate transport infrastructure (roads, rail, pipeline, ports and inland waterways) and trade matters along the Corridor. It undertakes interventions, working with different players and key stakeholders on the Northern Corridor route, from the Port of Mombasa to the six Member States of Burundi, Democratic Republic of Congo, Kenya, Rwanda, South Sudan and Uganda.
At the heart of the Northern Corridor, Uganda’s location is a critical determinant of time and costs to the final destination. However, it faces challenges, particularly at its weigh stations, which are essential for axle-load control designed to preserve roads and ensure safety. Here, delays arise due to inconsistent practices, poor site layouts, unreliable equipment, and service interruptions. As a result, the private sector has voiced concerns about long waiting times, inconsistent in weighing practices within Uganda and compared to Kenya, and the burden of undergoing up to five weighings per transit.
Uganda’s axle-load control system operates within a regional framework defined by the East African Community Vehicle Load Control Act of 2016, and harmonised standards from COMESA-EAC-SADC. Despite these regulations, enforcement and standards vary across countries, resulting in repeated weighings and causing delays.
This project is an important step towards strengthening a strategic African corridor, as well as advancing Global Gateway objectives of digital transition, inclusive growth and governance.
Objectives
The technical assistance is designed to improve the efficiency and predictability of freight movement on Uganda’s Northern Corridor segment while maintaining effective axle-load control. This will be done by establishing a comparable baseline for logistics performance across all relevant weigh stations and their approaches, and by developing an agreed plan for operational and process improvements. The work is strongly grounded in consultation with both public agencies and private corridor users.
The project will unfold in three key phases:
- Baseline review: Conducting interviews and consultations.
- Analysis enhancement through a public-private dialogue (PPD) and a peer review between Ugandan and Kenyan officials
- Piloting: Introducing immediate process improvements in at least one pilot site.
Expected results
Through this initiative, NCTCCA and Uganda’s Ministry of Works and Transport (MoWT) capacity to improve the weight station processes across Uganda’s Northern Corridor are supported through:
- A baseline assessment report, validated through a workshop with the steering group
- An operating procedures compendium for each site
- A technical note from the peer exchange with Kenya, which has recently upgraded its processes at weigh stations and its weighbridges, with recommendations of best practices applicable to Uganda
- An improvement plan with site-by-site measures and cross-cutting measures
- A Public Private Dialogue workshop to validate improvement plan, summarised in a written form
- A monitoring and reporting toolkit
- A concrete action plan for the pilot site
- A short note capturing lessons from the implementation of the pilot project and practical considerations for wider roll-out.
The project will engage with the women association of the logistics sector and the women truck drivers association in the interviews and PPD. By doing so, the Facility aims to ensure that the improvement plan includes concrete measures that will improve the use of weigh stations for women specifically.